The practical sides of the 8-th MW wind farm connection to 15 kV switching station in distributed power system is presented in this paper. The aim of this paper is to review the connection requirements of wind farms to the electric grid. The relation between rated power of wind farm and short-circuit power in common point, the wind farm influence on the short-circuit thermal effects in energy transmission lines and wind farm influence on transformer switch for tap-changing HV/MV transformers are discussed in the article.