Entity

Time filter

Source Type


He M.,State Engineering Laboratory for Exploration | He M.,Petrochina | Ma X.,State Engineering Laboratory for Exploration | Ma X.,Petrochina | And 8 more authors.
Petroleum Exploration and Development | Year: 2014

Sulige gas field is a typical low-permeability reservoir in China. According to desert landform features along with the regional hydrologic feature and the existing fracturing technology and operational conditions, a factory-like fracturing method suitable for Sulige gas field is established to improve techniques and production organization. This method includes five key parts: (1) centralized water supply mode (water source well supply+artificial lake storage); (2) highly efficient fracturing process (two mature multi-stage fracturing technologies, sliding sleeve fracturing for vertical wells and open-hole packer fracturing for horizontal wells); (3) pipeline operation mode with seven procedures, including well drift and flushing perforation etc; (4) high efficiency operation equipment; (5) recovery of fracturing flow-back fluid. This method shortens the preparation and operation period of fracturing treatment and also relieves the pressure on environment. Pilot tests were carried out in 11 well groups in total. Sixty-seven stages of fracturing in 14 wells were successfully completed within 42 days, representing a reduction of fracturing operation cycle of more than 50%, and an encouraging improvement in efficiency. © 2014 Research Institute of Petroleum Exploration & Development, PetroChina. Source

Discover hidden collaborations