Entity

Time filter

Source Type

Neustadt an der Weinstraße, Germany

Decker J.,SGD Sud | Dreisigacker G.,SGD Sud | Karg N.,SGD Sud | Koch W.,SGD Sud
Wasser und Abfall | Year: 2013

The Mechtersheim Polder as eighth of ten flood retention basins at the Rhineland-Palatinate Upper Rhine could be officially turned over on June 27, 2013 after a construction period of two and a half years. The resistance of the general public was directed in moderation proceedings with all concerned towards an amicable settlement and an alternative variant form of expansion. The importance of polder deployments to reduce the flood crest was proven impressively during the flood at the Rhine in the early summer of 2013. Source

Discover hidden collaborations