Entity

Time filter

Source Type


Zhang H.,SanChu Co. of China Railway Tunnel Group | Li J.,SanChu Co. of China Railway Tunnel Group
Modern Tunnelling Technology | Year: 2013

In the construction of the metro line Z1 in Tianjing, the enclosing diaphragm wall had a deepest point of 67 m. The line passed through a silt layer 18 m thick and was constructed in the winter, so the correct application of slurry was very important. Based on the technical specifications and actual construction of this line, this paper addresses the performance index of slurry used in this project and the measures that were adopted to control its quality. Source

Discover hidden collaborations