Time filter

Source Type

Liu M.,PetroChinaHuabei Oilfield Company | Xiong L.,PetroChinaHuabei Oilfield Company | Zhang Y.,PetroChinaHuabei Oilfield Company | Li Z.,PetroChinaHuabei Oilfield Company
Drilling Fluid and Completion Fluid | Year: 2015

The relief well, Wen23-6J, for the Well Wen23-6X is the first relief well drilled with the aid of SDI's magnetic range correction technology, and will greatly help in building a working gas storage of 3.9×108 m3 (active storage of 7.93×108 m3). The Well Wen23-6X is an accidental well drilled in 2005, with 2300 m of fish left in it. Long time of contact of borehole wall with drilling fluid makes it difficult to (even with SDI's advanced technology) detect the well path with no fish in it when drilled to 2588 m. The newly drilled hole only met with the old hole at five depths during drilling. 73 m3 of cement slurry was injected in 8 times into the hole to the meeting points. To ensure an effective sealing of the hole, a fixed direction-fixed tool face orientation perforation technology was applied the first time after the cementing of the relief well. Ultra-fine cement slurries were squeezed into #34 and #29 sandstones. Negative pressure (37.84 MPa) testing shows that the plugging of the well is successful and gas storage can be built around the relief well. ©, 2014, North China Petroleum Administration Drilling Technology Research Institute. All right reserved. Source

Discover hidden collaborations