OMV e and P GmbH

Germany

OMV e and P GmbH

Germany
SEARCH FILTERS
Time filter
Source Type

Marron A.J.,OMV E and P GmbH | Milner M.,OMV E and P GmbH | O'Hagan A.,OMV New Zealand Ltd. | Biniwale S.S.,Schlumberger | And 3 more authors.
Society of Petroleum Engineers - SPE/IATMI Asia Pacific Oil and Gas Conference and Exhibition, APOGCE 2015 | Year: 2015

The Maari oil field, the first OMV operated offshore oil field development, has showcased OMV's impressive technical skills. For this 80km offshore development, given the waxy oil and low aquifer support, 2 water injectors were drilled and Electric Submersible Pumps (ESPs) installed on all 7 producing wells to help with pressure maintenance and production improvement. A SCADA system and associated Production Historian Database (PHD) was included in order to capture the high frequency data for well & reservoir surveillance and daily production optimisation of the field. However, there were many challenges in utilising this live data stream from the offshore facility. In particular, it was vital to continuously and effectively monitor and optimise ESP performance in order to improve run life, reduce downtime and ultimately increase production. An integrated decision support system was therefore required for real-time data collection, production monitoring, ESP health check and KPI analysis for proactive decision making and limiting the number of manual processes involved. This paper describes how these challenges were overcome by creating an integrated workflow and aligning the existing system architecture in order to meet the business needs. The system is based on full workflow automation, and has been deployed for data acquisition, validation and analysis by optimising the components of integrated asset management. The system includes an integrated framework connected to various live data sources with different time increments, allowing data aggregation to a reliable intra-day hub. Automated job scheduling has also been built in with a decision support dashboard setup for production analysis and ESP performance monitoring. Based on historical trends, an optimum operating envelope was defined and automatic rules were configured for anomaly detection. The system has provided standardized data access throughout the asset team, streamlining their entire process and resulting in improved efficiency, which has optimised the engineers time for core operational activities. With a secure and automated workflow, and the ability for multiple users to work simultaneously, the system has minimised their downtime, thus improving overall productivity. Utilizing the live data feed for updating of simulation models and comparisons of numerical predictions with analytical forecasts has helped integrate their reservoir management for operational accomplishment. The system has not only assisted the team in meeting their production reporting deadlines, but has also alleviated bottlenecks in their decision-making processes helping to boost overall asset productivity. Copyright 2015, Society of Petroleum Engineers.


Paraschiv C.,OMV e and P GmbH | Abdev J.,OMV e and P GmbH | Clemens T.,OMV e and P GmbH
74th European Association of Geoscientists and Engineers Conference and Exhibition 2012 Incorporating SPE EUROPEC 2012: Responsibly Securing Natural Resources | Year: 2012

Fractured reservoirs are characterised by a large difference in permeability of the fracture and matrix system. Usually, the matrix contains the bulk of the oil while the fractures are the flow paths. These characteristics are challenging for projects aiming at increasing hydrocarbon liquid recovery from gas condensate fields by gas injection. While in fractured oil reservoirs, capillary forces (imbibition) or gravity forces can be utilised to improve oil recovery, for gas injection into gas condensate reservoirs, these forces are less important.

Loading OMV e and P GmbH collaborators
Loading OMV e and P GmbH collaborators