Macdonald Dettwiler Space Missions

Brampton, Canada

Macdonald Dettwiler Space Missions

Brampton, Canada

Time filter

Source Type

Moores J.E.,University of Western Ontario | Francis R.,University of Western Ontario | Mader M.,University of Western Ontario | Osinski G.R.,University of Western Ontario | And 41 more authors.
Advances in Space Research | Year: 2012

A Mission Control Architecture is presented for a Robotic Lunar Sample Return Mission which builds upon the experience of the landed missions of the NASA Mars Exploration Program. This architecture consists of four separate processes working in parallel at Mission Control and achieving buy-in for plans sequentially instead of simultaneously from all members of the team. These four processes were: science processing, science interpretation, planning and mission evaluation. science processing was responsible for creating products from data downlinked from the field and is organized by instrument. Science Interpretation was responsible for determining whether or not science goals are being met and what measurements need to be taken to satisfy these goals. The Planning process, responsible for scheduling and sequencing observations, and the Evaluation process that fostered inter-process communications, reporting and documentation assisted these processes. This organization is advantageous for its flexibility as shown by the ability of the structure to produce plans for the rover every two hours, for the rapidity with which Mission Control team members may be trained and for the relatively small size of each individual team. This architecture was tested in an analogue mission to the Sudbury impact structure from June 6-17, 2011. A rover was used which was capable of developing a network of locations that could be revisited using a teach and repeat method. This allowed the science team to process several different outcrops in parallel, downselecting at each stage to ensure that the samples selected for caching were the most representative of the site. Over the course of 10 days, 18 rock samples were collected from 5 different outcrops, 182 individual field activities - such as roving or acquiring an image mosaic or other data product - were completed within 43 command cycles, and the rover travelled over 2200 m. Data transfer from communications passes were filled to 74%. Sample triage was simulated to allow down-selection to 1 kg of material for return to Earth. © 2012 COSPAR. Published by Elsevier Ltd. All rights reserved.

Loading Macdonald Dettwiler Space Missions collaborators
Loading Macdonald Dettwiler Space Missions collaborators