Korea Electric Power Corporation, better known as KEPCO, is the largest electric utility in South Korea,responsible for the generation, transmission and distribution of electricity and the development of electric power projects including those in nuclear power, wind power and coal. KEPCO is responsible for 93% of Korea's electricity generation. The South Korean government owns a 51% share of KEPCO. Together with its affiliates and subsidiaries, KEPCO has an installed capacity of 65,383 MW. On the 2011 Fortune Global 500 ranking of the world's largest companies, KEPCO was ranked 271. KEPCO is a member of the World Energy Council, the World Nuclear Association and the World Association of Nuclear Operators. As of August 2011, KEPCO possesses an A+ credit rating with Fitch Ratings, while Moody's has assigned KEPCO an A1 stable rating.Currently located in Samseong-dong, Seoul, KEPCO headquarters is scheduled to relocate to the city of Naju in South Jeolla Province in August 2014 as part of a government decentralization program. The move, which has been in the works for years has been controversial Hwan-Ik Cho is the president and CEO of KEPCO. Wikipedia.


Time filter

Source Type

Patent
Korea Electric Power Corporation | Date: 2017-03-29

A marine structure installation vessel and a method of installing a marine structure. The marine structure installation vessel includes a hull (110) moving while floating at sea level, wherein a seawater chamber (111) is formed therein and a marine foundation (150) is loaded thereon, a docking device (120) mounted on the hull and configured to support a marine structure (160) , and a pumping device (130) supplying seawater to the seawater chamber to submerge the hull and floating the marine foundation from the hull by buoyancy, and draining the seawater from the seawater chamber to float the hull.


Patent
Korea Electric Power Corporation | Date: 2017-03-29

Disclosed are a marine foundation and a construction method thereof. The marine foundation of the present invention includes a self-weight control tank unit moving while floating at sea level and submerged and installed on the ocean floor when seawater is supplied thereto, a monopod unit installed on the self-weight control tank unit to be lowered and connected to a marine structure, a guide bucket unit installed under the monopod unit and mounted on the ocean floor by discharging seawater, and a leg unit installed under the self-weight control tank unit.


The present invention relates to to an IEC 61850 information-based agent system for intelligent system management by a digital substation and an operation method therefor. To this end, an operating system-side agent device for sharing switch information, which is used in automatic recovery of a digital substation, between an operating system and an intelligent electronic device (IED) in the digital substation, the device including: a request unit requesting the switch information from an intelligent electronic device-side agent device mounted in the intelligent electronic device (IED); and a communication unit receiving the switch information from the intelligent electronic device-side agent device, the switch information being collected by the intelligent electronic device-side agent device, wherein the operating system-side agent device is provided as a module, and is mounted in the operating system.


Disclosed herein are an apparatus and method for diagnosing the state of a power cable and measuring the remaining life thereof using VLF TD measurement data, and for determining a replacement time of a power cable using a 3D matrix exhibiting reproducibility of diagnosis of the state of the power cable. The apparatus and method for diagnosing the state of a power cable and measuring the remaining life thereof according to the present invention includes a Weibull modeling unit, a distance limiting unit, a data type classifying unit, a quantity representing unit, a normalization unit, a 3D constructing unit, a risk level calculating unit, and a remaining life measuring unit.


Patent
Korea Electric Power Corporation | Date: 2016-10-26

The present invention relates to a seismic reinforcing device capable of conveniently conducting reinforcement of a structure, the device includes an upper support installed on an upper horizontal portion configured to connect columns, a lower support disposed under the upper horizontal portion, installed on a lower horizontal portion configured to connect the columns, and disposed in a diagonal direction with respect to the upper support, and a damper coupled to the upper support and the lower support and configured to absorb a shock.


Patent
Korea Electric Power Corporation | Date: 2017-02-24

The present invention relates to a method and device for generating an engineering topology of a digital substation. The method may include: generating, by a single line diagram generation module, a single line diagram of the digital substation based on input information regarding a plurality of substation component devices and connection relations therebetween; converting, by a topology conversion module, the single line diagram of the digital substation into an engineering topology conforming to international standards by use of conversion conditions stored in a topology component management module; verifying, by a topology verification module, whether the engineering topology is suitable for the digital substation based on the international standards; and generating, by an international standard file generation module, a single line diagram engineering file of the digital substation as a system specification description (SSS) by use of the verified engineering topology.


Patent
Korea Electric Power Corporation | Date: 2016-11-23

An HVDC power increase controller includes a command output unit for outputting a current command value according to a disturbance signal to a main controller; a voltage drop determiner receiving an alternating current (AC) voltage and comparing a level of the AC voltage to a lowest level of a voltage causing a rectification failure; and a power tracking determiner receiving a direct current (DC) power and comparing a level of the DC power to an estimated power level corresponding to the current command value. The command output unit adjusts the current command value according to a comparison result of the voltage drop determiner and the power tracking determiner.


Patent
Korea Electric Power Corporation and Korea Southern Power Co. | Date: 2016-06-24

A heat exchange apparatus for circulating fluidized bed boilers is disclosed. The heat exchange apparatus for circulating fluidized bed boilers includes a particle separator configured to separate an exhaust gas and a flow medium discharged from a combustion furnace, an external heat exchanger into which the flow medium collected in the particle separator flows and which is configured to heat a heat transfer medium by heat exchange with the flow medium, and a flow control unit installed at the external heat exchanger and configured to supply air to a flow path of the flow medium and to regulate an internal temperature of the external heat exchanger under the control of a flow direction and a flow quantity of the flow medium.


Patent
Korea Electric Power Corporation | Date: 2016-08-10

The present invention relates to an apparatus for economically charging an electric vehicle, the apparatus including: an input unit configured to receive an input of charge state information of a vehicle from a charger; a control unit configured to calculate a charge slope based on an actually measured charge state information of the vehicle, compute a charge schedule based on the charge slope and a power rate for each time slot, and control the charger in accordance with the charge schedule; and a storage unit configured to store the charge state information and the charge schedule.


Patent
Korea Electric Power Corporation | Date: 2016-12-14

A system (100) for management of a circuit breaker counter according to an exemplary embodiment of the present invention includes a data processing unit (110) receiving state change data and measurement data of at least one of a circuit breaker and a current measuring unit and transferring an event on the basis of the state change data and measurement data; and a counter managing unit (120) counting a total operation, a load-breaking operation and a fault-breaking operation of the circuit breaker, based on the event and the measurement data, and outputting and storing respective count accumulation values.