Margolina O.G.,JSC VNIIG Im. B. E. Vedeneeva | Vorob'ev K.M.,JSC VNIIG Im. B. E. Vedeneeva | Radzinskii A.V.,JSC Gidrospetsproekt | Bogomolov A.R.,JSC Geoizol
Power Technology and Engineering | Year: 2014

Experience with reinforcement of an anti-filtration curtain under complex geologic conditions, high heads, and heavy return flows of water is examined, and the history of the problem, difficulties with which were encountered during work production and scientific investigations, and means of their solution are presented. A preliminary assessment of the effectiveness of measures taken based on full-scale studies and construction monitoring is given. © 2014, Springer Science+Business Media New York. Source


Korchevskii V.F.,JSC Gidrospetsproekt | Malyshev A.M.,JSC KPII Gidroenergoproekt | Kolichko A.V.,JSC KPII Gidroenergoproekt | Orekhov V.V.,JSC MIGG
Power Technology and Engineering | Year: 2012

Various types of water-retaining structure are examined for the Kankunskaya HPP, and an alternative layout with an earthen dam and a new design for its anti-filtration element are proposed for the hydroproject. © 2012 Springer Science+Business Media, Inc. Source


Shuifer M.I.,JSC Gidrospetsproekt | Argal E.S.,JSC Gidrospetsproekt
Power Technology and Engineering | Year: 2012

Results of complex instrument observations and video taping during large-scale blasts detonated for creation of the dam at the No. 2 Kambaratinskaya HPP on the Naryn River in the Kyrgyz Republic are analyzed. Tests of the energy effectiveness of the explosives are evaluated, characteristics of LSB manifestations in seismic and air waves are revealed, and the shaping and movement of the rock mass are examined. A methodological analysis of the planning and production of the LSB is given. © 2012 Springer Science+Business Media, Inc. Source


Kudrin K.P.,JSC Gidrospetsproekt | Korolev V.M.,Moscow State University | Argal E.S.,JSC Gidrospetsproekt | Solov'eva E.V.,JSC Gidrospetsproekt | And 2 more authors.
Power Technology and Engineering | Year: 2015

Designs and procedures are described for construction of an anti-filtration diaphragm in the body of the cofferdam for the pit of the first phase of construction of basic structures at the Lower Bureya HPP in the form of a diaphragm wall formed from cast-in-placed intersecting piles filled with a composition material. Procedures and results of development of a composite material-filler of the diaphragm walls are presented. Results of monitored performance are analyzed. Recommendations are given for practical use of the developments described. © 2015 Springer Science+Business Media New York. Source