Geoterm EM

Moscow, Russia

Geoterm EM

Moscow, Russia
SEARCH FILTERS
Time filter
Source Type

Tomarov G.V.,Geoterm EM | Shipkov A.A.,Geoterm EM | Lovchev V.N.,Concern Rosenergoatom | Gutsev D.F.,Concern Rosenergoatom
Thermal Engineering | Year: 2016

Problems of metal flow-accelerated corrosion (FAC) in the pipelines and equipment of the condensate- feeding and wet-steam paths of NPP power-generating units (PGU) are examined. Goals, objectives, and main principles of the methodology for the implementation of an integrated program of AO Concern Rosenergoatom for the prevention of unacceptable FAC thinning and for increasing operational flow-accelerated corrosion resistance of NPP EaP are worded (further the Program). A role is determined and potentialities are shown for the use of Russian software packages in the evaluation and prediction of FAC rate upon solving practical problems for the timely detection of unacceptable FAC thinning in the elements of pipelines and equipment (EaP) of the secondary circuit of NPP PGU. Information is given concerning the structure, properties, and functions of the software systems for plant personnel support in the monitoring and planning of the inservice inspection of FAC thinning elements of pipelines and equipment of the secondary circuit of NPP PGUs, which are created and implemented at some Russian NPPs equipped with VVER-1000, VVER-440, and BN-600 reactors. It is noted that one of the most important practical results of software packages for supporting NPP personnel concerning the issue of flow-accelerated corrosion consists in revealing elements under a hazard of intense local FAC thinning. Examples are given for successful practice at some Russian NPP concerning the use of software systems for supporting the personnel in early detection of secondary-circuit pipeline elements with FAC thinning close to an unacceptable level. Intermediate results of working on the Program are presented and new tasks set in 2012 as a part of the updated program are denoted. The prospects of the developed methods and tools in the scope of the Program measures at the stages of design and construction of NPP PGU are discussed. The main directions of the work on solving the problems of flow-accelerated corrosion of pipelines and equipment in Russian NPP PGU are defined. © 2016, Pleiades Publishing, Inc.


Tomarov G.V.,Geoterm EM | Nikolaev A.E.,MOEK | Semenov V.N.,Geoterm EM | Shipkov A.A.,Geoterm EM | Shepelev S.V.,Geoterm EM
Thermal Engineering (English translation of Teploenergetika) | Year: 2015

The results of laboratory studies of material properties and of numerical and analytical investigations to assess the stress-strain state of the metal of the bellows expansion joints used in the district heating system pipelines at MOEK subjected to corrosion failure are presented. The main causes and the dominant mechanisms of failure of the expansion joints have been identified. The influence of the initial crevice defects and the operating conditions on the features and intensity of destruction processes in expansion joints used in the district heating system pipelines at MOEK has been established. © Pleiades Publishing, Inc., 2015.


Tomarov G.V.,Geoterm EM | Nikol'Skii A.I.,Geoterm EM | Semenov V.N.,Geoterm EM | Shipkov A.A.,Geoterm EM
Thermal Engineering (English translation of Teploenergetika) | Year: 2014

The equipment of and technological processes in the pilot industrial model of the domestically produced binary-cycle geothermal power unit operating on the discharge separate at the Pauzhet geothermal power station are considered. The development principles, the design and operational features, and the data on selecting the metal in manufacturing the main equipment of the 2.5-MW binary power unit of the geothermal power station are described. © 2014 Pleiades Publishing, Inc.

Loading Geoterm EM collaborators
Loading Geoterm EM collaborators