Entity

Time filter

Source Type

Bang Rak, Thailand

Masuchun R.,King Mongkuts University of Technology Thonburi | Masuchun W.,Center Co. | Thepmanee T.,King Mongkuts University of Technology Thonburi
ICIC Express Letters | Year: 2010

This paper presents an approach to integrate the m-machine productionscheduling into Material Requirements Planning (MRP). In general, generating MRPconsiders only Bill of Materials (BOM) and, ignores capacity constraints and,operating sequences; therefore, a, production plan is unachievable whenscheduling is actually performed next on shop-floor. That is why recent researchhas focused on executing both MRP and, scheduling simultaneously. Our approachuses an integer linear programming model to plan and, schedule concurrently tolook right through the capacity constraints and, operating sequences. Theobjective function of the proposed, model considers both planning and,scheduling purposes that is to minimize total inventory costs and, order'stardiness. All significant and inevitable concerns when separately generatingMRP and schedule are incorporated, with the model through several constraints.Numerical results show that this model can be used, to simultaneously generatereasonable MRP as well as feasible and, optimal m-machine production schedule.ICIC International © 2010. Source

Discover hidden collaborations