Entity

Time filter

Source Type

Steinau an der Straße, Germany

Anistoroaiei C.,Beratende Ingenieure VBI GmbH | Brand W.,DYWIDAG Systems International GmbH | Langer S.,Hermann Kirchner Hoch und Ingenieurbau GmbH | Puls J.,Donges SteelTec GmbH
Stahlbau | Year: 2013

On the fi rst of November was the last steel segment of the main span of the new bridge over the Elbe near Schönebeck successfully lifted. The new bridge has a total length of 1128.50 m and a mainspan of 185 m built as a single tower cable-stayed Bridge. Source


Angelmaier V.,Beratende Ingenieure VBI GmbH | Eilzer W.,Beratende Ingenieure VBI GmbH
Engineering for Progress, Nature and People | Year: 2014

In 2007 the City of St. Gallen, Switzerland, has announced a public competition for a new bridge across the Tamina Canyon. This paper presents the winning design, informs about the current status of the planning process and gives an outlook on the further steps. Source


Jung R.,Beratende Ingenieure VBI GmbH | Marx S.,University of California at San Diego | Schenkel M.,DB ProjektBau GmbH | Stockmann R.,Beratende Ingenieure VBI GmbH
Beton- und Stahlbetonbau | Year: 2011

The Bridge over Stoebnitz Valley - a Bridge without Bearings on High-Speed Railway Route Erfurt - Leipzig/Halle Currently some large valley bridges are under construction on high-speed railway route Erfurt-Leipzig/Halle. These bridges follow a new holistic design philosophy. The superstructures of those integral or semi-integral bridges are rigidly connected to the abutments and the columns. Therefore, they are more slender than conventional bridges and the bridges are very robust and durable because of the omitting of bearings and dilatation joints. The bridges over Scherkonde valley and over Gaensebach valley were already described in previous issues. In this paper the construction of the bridge crossing Stoebnitz valley is reported. This bridge is being built as an alternate design of the contractor. © 2011 Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH & Co. KG, Berlin. Source


Eilzer W.,Beratende Ingenieure VBI GmbH | Angelmaier V.,Beratende Ingenieure VBI GmbH | Klug A.,Beratende Ingenieure VBI GmbH
Bauingenieur | Year: 2012

In 2007 the City of St. Gallen, Switzerland, has announced a public competition for a new bridge across the Tamina Canyon. This paper presents the winning design, informs about the current status of the planning process and gives an outlook on the further steps. Source


Eilzer W.,Beratende Ingenieure VBI GmbH | Priebe V.,Landesbetrieb Mobilitat Kaiserslautern | Stockmann R.,Beratende Ingenieure VBI GmbH | Lutz R.,Landesbetrieb Mobilitat Kaiserslautern | Angelmaier V.,Beratende Ingenieure VBI GmbH
Stahlbau | Year: 2010

In the course of the expansion of the federal motorway A 6 between Mannheim and Saarbrücken up to six lanes the existing Waschmühl Viaduct, classified as historic monument, has to be refurbished and widened. Therefore a new bridge shall be built next to the historic sandstone arch bridge. Due to this specific situation and the artistically importance of the Waschmühl Viaduct designed by Paul Bonatz, a design competition for the new bridge has been organized. This article reports on the results of the competition and the final design of the new bridge. © Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH & Co. KG. Source

Discover hidden collaborations