Entity

Time filter

Source Type


The article describes the organizational and engineering package aimed to prepare and start the initial phase of open pit mining at the V. Grib Mining and Processing Combine - openingup of the diamond deposit in complicated mining-and-geological and mine-technical conditions. The author describes the accepted mining and transport equipment, the mining technology, maintenance and repair management and staffing. © Paley L. M., 2014. Source


Studenov I.I.,Polar Research Institute of Marine Fisheries And Oceanography | Novoselov A.P.,Polar Research Institute of Marine Fisheries And Oceanography | Sukhanevich M.M.,Arkhangelskgeoldobycha
Eurasian Mining | Year: 2014

The article focuses on preservation of water bodies and fishery water courses as a high priority concern of ecological activity of industry. The state of bio-resources is analyzed, and potential fishery loss under man-made impact is estimated. The authors specify the key trends of compensatory measures and regeneration of commercial fish species. Recommendations on aqueous eco-system monitoring are given. © Studenov I. I., Novoselov A. P., Sukhanevich M. M., 2014. Source


Zaostrovtsev V.N.,Arkhangelskgeoldobycha | Minyaeva I.A.,Arkhangelskgeoldobycha | Babadustov O.I.,Weir Minerals RFW
Eurasian Mining | Year: 2014

The article describes the abuilding innovation computerized system of three-stage process water pumping from the open pit mine of the V. Grib Mining and Processing Combine. The described water drainage takes advantage of the world's greatest achievements in the related field of technology: pumping units Multiflo of Weir Minerals, plastic and rubber-lined pipes, frequency converters, controllers, as well as communication, information and automation facilities. Source


Zaostrovtsev V.N.,Arkhangelskgeoldobycha | Khomyakov K.V.,Arkhangelskgeoldobycha
Eurasian Mining | Year: 2014

The article describes the accepted flow chart, basic equipment and production data of an abuilding processing plant intended for treatment of diamond ore extracted from Grib diamond deposit. The project and working documentation for the processing plant construction and tailings storage management are developed by Mekhanobr Engineering JSC. The annual design capacity of the abuilding processing plant is 5.5 Mt of ore with humidity of 5%, or 4.275 mln t of dry ore. The diamond recovery of conventional screen size +3 DTS (+1.2 mm) is 95-98%. © Zaostrovtsev V. N., Khomyakov K. V., 2014. Source


Zaostrovtsev V.N.,Arkhangelskgeoldobycha | Minyaeva I.A.,Arkhangelskgeoldobycha | Sukhanevich M.M.,Arkhangelskgeoldobycha | Gorev A.V.,Ecoline
Eurasian Mining | Year: 2014

Under description is the large-scale technology-and-equipment system for two-stage treatment of open pit mine process and surface water before its discharge in a natural fishery water body. The wastewater purification standard is reached owing to combination of mechanical and chemical treatment. The mine wastewater treatment system capacity is over 3.2 thsd m3 /h. Source

Discover hidden collaborations